| Lieu | El Salvador |
|---|---|
| Année | 2023 |
| Type | Commemorative medal |
| Composition | Copper |
| Poids | 33 g |
| Diamètre | 40 mm |
| Épaisseur | 3 mm |
| Forme | Round |
| Technique | Milled |
| Orientation | Medal alignment ↑↑ |
| Tranche | Serial Number |
| Période | |
| Notice | |
| Référence(s) |
| Description de l’avers | The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador. |
|---|---|
| Écriture de l’avers | Latin |
| Légende de l’avers | PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO |
| Description du revers | The reservoir and the dam of the hydroelectric power plant. |
| Écriture du revers | Latin |
| Légende du revers | EL SALVADOR 2023 |
| Tirage | |
| ID Numisquare | 8879641630 |
| Commentaires |
|